Fencing Project Checklist - Free Copy By Email
Nearly every fencing problem starts before the first post goes in: the boundary was never confirmed, the neighbour was told rather than asked, or two quotes described different fences. These are the 22 things worth settling first on a Toowoomba block, in the order they actually come up, with a note on what goes wrong if you skip each one. Read it here, or have it emailed to you as a checklist you can tick off.
Before you build a dividing fence in Toowoomba
Work down the list in order. The first two sections decide whether you can proceed at all and who pays for what, and they are the ones people skip.
1. Settle the boundary first
-
Confirm where the boundary actually runs from the title plan, existing survey pegs, or a licensed surveyor where it is genuinely unclear.
Why it matters: Building even slightly over the line creates a dispute that outlives the fence, and moving a finished run is entirely at your cost.
-
Decide whether the fence is entirely on your land or sits on the boundary.
Why it matters: A fence on the boundary is a dividing fence, which brings the cost-sharing process into play. A fence wholly inside your land does not.
-
Check whether a retaining wall, easement, drainage line or services run along the fence line.
Why it matters: A fence on a retaining wall is measured as the combined height, and nobody wants a post hole through a water main or a sewer connection.
2. Handle the neighbour before you order anything
-
Talk to the neighbour early, before you have a favourite quote and a start date in your head.
Why it matters: Most cost-sharing arguments are really about being told rather than asked. A conversation first avoids weeks of stalling later.
-
Work out what a sufficient dividing fence is for your block, and what your preference costs above that.
Why it matters: In Queensland adjoining owners generally contribute equally to a sufficient fence only - roughly 0.5 m to 1.8 m of prescribed materials for residential land. The upgrade is on whoever wants it.
-
Get at least one written quote before you serve any formal notice.
Why it matters: A notice to contribute has to state the land, the fence line, the work and the estimated cost, with a written quotation attached. Without the quote it is not a valid notice.
-
Note the timeframes: one month to reach agreement after the notice, then two months to apply to QCAT.
Why it matters: Miss the window and you start again. Knowing the clock exists also makes the first conversation more productive.
-
If the neighbouring property is rented, get the owner's or property manager's details rather than dealing with the tenant.
Why it matters: Tenants cannot agree to fencing contributions. Time spent negotiating with the wrong party is time wasted.
-
Ask for split invoicing so each owner is billed their own share.
Why it matters: It stops you fronting the whole cost and then chasing your neighbour for half of it.
3. Check height, approval and pool rules
-
Measure the intended height above natural ground level, and add any retaining wall underneath it.
Why it matters: Up to 2 m is generally accepted development in Queensland. Above that it is building work needing a certifier's approval, and a wall plus a fence can cross 2 m without anyone planning it.
-
On a corner block, check the sight-line truncation at the intersection before deciding on a front fence.
Why it matters: Fencing in the visibility triangle is kept low so drivers can see across. Building it full height means taking it down again.
-
If the fence forms part of a pool barrier, treat it as a separate job with its own rules.
Why it matters: Queensland pool barriers must be at least 1200 mm high, with the gate latch release at least 1500 mm up, a 900 mm non-climbable zone, and gaps no more than 100 mm. Certification is by a licensed pool safety inspector, and you need a current certificate to sell or lease.
4. Match the fence to the block
-
Decide what the fence is actually for: privacy, containing a dog or pool, street appeal, stock, or security.
Why it matters: Aluminium slat fencing is semi-privacy, not privacy. A ringlock run holds stock but hides nothing. Choosing on looks alone is how people end up rebuilding.
-
Ask how the footings and post spacing suit your ground and your wind exposure.
Why it matters: Reactive black soil heaves and shrinks through wet and dry cycles, and exposed range-edge blocks carry more wind load on a solid panel run. Post spacing and footing depth should follow the manufacturer's tables for that site, not a standard number.
-
For a sloping run, confirm whether the fence is stepped or raked, and what happens to the gaps at the ground.
Why it matters: Stepping leaves triangular gaps under the panels unless the design allows for it, which matters if you are containing a dog or a pool.
-
Count the gates you need and where they go, including whether a driveway gate will be automated later.
Why it matters: Gate posts carry the most load and go out of plumb first here. Sizing the post and running conduit for a motor now is far cheaper than retrofitting.
-
Work out how a machine gets to the fence line, and whether any of it will be hand dug.
Why it matters: Access is one of the biggest swing factors in a fencing price, and it is the thing most often discovered on the day rather than at quoting.
5. Compare the quotes properly
-
Check every quote states the metres, the height, the material and the finish, not just a total.
Why it matters: Two quotes for the same back fence often describe different fences. Without the detail you are comparing nothing.
-
Confirm whether removal and disposal of the old fence is included, excluded, or a separate line.
Why it matters: This single item is the most common reason two prices look hundreds apart, and concreted-in posts cost more to pull out than people expect.
-
Check the contractor holds a current QBCC licence appropriate to the work and its value.
Why it matters: On residential land, paid fencing work of $3,300 or more including labour and materials needs a licensed contractor. Rural wire fencing with no concrete footings is exempt at any value, so the answer depends on your job.
-
Ask what the payment schedule is and how much is due before work starts.
Why it matters: A large upfront deposit is the pattern behind most fencing horror stories. Keep early exposure small and get the terms in writing.
-
Confirm the quote's validity period and how variations are handled.
Why it matters: A fixed price that quietly expires, or changes once digging starts, is the second most common complaint. Variations should be agreed in writing before the work is done.
Method and sources
What this checklist is. A planning sequence for a residential fencing job in Queensland, assembled from the rules that decide what you may build and the failure patterns people describe publicly after a job goes wrong. It is general information, not legal advice, and it is not a compliance certificate for anything.
Where the items come from. The cost-sharing, notice and timeframe items come from the Neighbourhood Disputes (Dividing Fences and Trees) Act 2011 (Qld), sections 13 and 31 - the sufficient-fence definition and the notice-to-contribute process - with disputes heard by QCAT. The height and siting items follow the Queensland Development Code and Toowoomba Regional Council. The pool barrier dimensions and the licensing threshold and exemptions come from the QBCC. The soil, wind and footing items come from CSIRO soil mapping of the Toowoomba area and the wind-classification approach in AS 4055. All current as at July 2026.
The assumptions, and what it does not cover. It assumes a residential job in Queensland, on a boundary you can identify, where both owners are contactable and the work is paid rather than owner-built. It will not tell you whether your specific fence needs approval, what your neighbour will agree to, or whether an existing pool barrier complies. Height, siting and pool compliance are decided by a building certifier or a licensed pool safety inspector on your actual site, and no checklist substitutes for that inspection. Confirm anything that affects your decision before you spend money.
We email the checklist to the address you give us. Submitting the form also means we can get in touch about your fence if you want a quote. See our privacy policy.
Already know what you want?
Skip ahead and request a fencing quote, or price the run first with the fence cost calculator. The FAQ page goes deeper on the neighbour and approval questions, and the services pages cover each material's cost to own.